Pass4sure BICSI RCDD-002 Dumps

Get ready to pass your exam right away with BICSI RCDD-002 Practice Questions. These BICSI RCDD-002 PDFs are specially designed to make passing easier without any difficulties!

discount banner
Exam Name:
BICSI Registered Communications Distribution Designer - RCDD
Exam Code:
RCDD-002
Questions:
361
Update Date
Apr 26, 2025
PDF + Test Engine
$65 $97.5
Test Engine
$55 $82.5
PDF
$45 $67.5

PASS4SURE – BEST PRACTICE QUESTIONS FOR BEST RESULTS!

According to recent global reports, there is a considerable rise in demand for BICSI RCDD certified professionals. Every other professional is on the lookout to better their career. That is the reason why hundreds of candidates apply for the BICSI Registered Communications Distribution Designer - RCDD Exam every year.

BICSI has topped all other industries in development and progress for the last few years. That’s why they make their RCDD-002 Exam complex and up to the standards of day-to-day job tasks. We sensed the need for an accurate and reliable Pass4Sure Dumps PDF and jumped right in to provide a helping hand to struggling professionals.

If you are also one of the hopeful aspirants of RCDD certification, consider buying RCDD-002 Braindumps to pass your exam with distinction. Our experts are working hard daily to give you the best quality BICSI Registered Communications Distribution Designer - RCDD RCDD-002 Practice Questions. Hundreds of clients have benefitted from Pass4Sure Question Answers, and you can be next.

Pass4Sure team gives 100% for you so you can give your 100% in the exam. With our help, there is no reason left you couldn’t possibly meet your goals. Free RCDD-002 Dumps make passing RCDD Exam piece of cake. So, get ready for a glittering IT Career in your near future!

WHY US? – REASONS TO BUY BICSI RCDD-002 QUESTION ANSWERS

Pass4Sure offers an all-encompassing Dumps PDF set. It has everything an RCDD-002 exam candidate needs to pass with an incredible result. We give you a free demo, discounts, free updates for the first three months, and many more. Anyone who wishes to pass the BICSI Exam in the very first attempt must try Pass4Sure RCDD-002 Braindumps.

IT industry can always use a proficient and reliable professional to handle their daily jobs. A professional that is an expert in all required tasks is a much-needed asset to an organization. Employers are looking for professionals like that. And we aim to make you into one of the highest-paid, highly-skilled, and credible professionals. It can be possible with our RCDD-002 Practice Questions. Getting RCDD certified is not a far-fetched dream anymore.

Our focus is providing ease to our precious customers, and it shows in our dedication. After a long-and-hard data analysis, Pass4Sure came up with the best solution to aid failing BICSI Registered Communications Distribution Designer - RCDD candidates. Moreover, we make sure you are not left alone in any step of your training. Our reliable experts stay 24/7 active to help you in your success. With top-class Pass4sure RCDD-002 Question Answers, passing the BICSI Registered Communications Distribution Designer - RCDD exam is 100% guaranteed.

LET OUR FREE DUMPS BE YOUR BIGGEST ACHIEVEMENT!

Our team has curated the best study materials to ease the process of preparing for IT exams. For example, RCDD-002 Free Dumps are designed to reflect your exam pattern and format to offer real-like stimulation. The material is 100% tested and approved to get you the success you crave. Unlike others, we keep you updated on your progress. Your good and bad points are laid before you as they are. So, you can focus on bettering yourself accordingly.

The whole process is easy-peasy. For example, the website interface is user interactive. Plus, Accessing and downloading the BICSI RCDD-002 Dumps PDF is a matter of just a few clicks.

Pass4sure gives its customers the best, material created with the help of well-known experts, and Practice Questions draw positive results every single time. The RCDD-002 Braindumps are updated daily to avoid any difficulties for customers. The package comes in two different formats to meet different types of clients. PDF for candidates always on the go and online test engine for those who enjoy a real-like experience.

The feedback we receive from our valued customers is proof of our credibility. Our customer care service is always at your beck and call. Leave us an email or a message in the chatbox below, and we will be there for you within seconds.

Pass4sure RCDD-002 dumps

BICSI Registered Communications Distribution Designer - RCDD

Sample Questions


RCDD-002 Sample Question 1


What would be the minimum length of casing to cross a single railroad track at 90 degrees? 

A. 15 feet. 
B. 50 feet. 
C. 35 feet 
D. 25 feet. 


ANSWER : C



RCDD-002 Sample Question 2


You are placing an entrance cable between two buildings connected by a conduit 205.3 m (588 ft) in length. What would be the MAXIMUM length of unlisted OSP cable that could be used before you terminate the cable or transition it to a listed cable? 

A. 185 m (607 ft) 
B. 200 m (656 ft) 
C. 209 m (686 ft) 
D. 213 m (700 ft) 
E. 216 m (708 ft)


ANSWER : C



RCDD-002 Sample Question 3


What is the MINIMUM vertical separation between the top rail of a railroad track and telecommunications facilities placed beneath the track? 

A. 508 mm (20 in) 
B. 762 mm (30 in) 
C. 1020 mm (40 in) 
D. 1280 mm (50 in) 
E. 1525 mm (60 in) 


ANSWER : D



RCDD-002 Sample Question 4


You have the responsibility of designing a railroad track crossing for an outside plant OSP cable. There are three separate railroad tracks to be crossed. The measurement between the center of the two outer tracks is 16 m (52 ft). Using the standard track width of 1435 mm (4 ft 8.5 in), what is the length of the rigid steel conduit required to facilitate the crossing? 

A. 20 m (66 ft) 
B. 25 m (82 ft) 
C. 31 m (102 ft) 
D. 35 m (115 ft) 
E. 40 m (130 ft)


ANSWER : C



RCDD-002 Sample Question 5


When installing underground entrances, no more than ________ 90-degree bends should be included between pulling points.

A. One 
B. Two 
C. Three 
D. Four 


ANSWER : B



RCDD-002 Sample Question 6


Buildings larger than ________ must contain a dedicated room for the termination of entrance facilities. 

A. 5529 square m (60,000 square ft) 
B. 7389 square m (80,000 square ft) 
C. 9300 square m (100,000 square ft)
 D. 11,160 square m (120,000 square ft) 
E. 13,300 square m (140,000 square ft) 


ANSWER : C



RCDD-002 Sample Question 7


Which one of the following is NOT an advantage of direct-buried cable? 

A. Is flexible for future reinforcements or changes 
B. Has a low initial installation cost 
C. Can easily bypass obstructions 
D. Preserves the aesthetic appearance of buildings 


ANSWER : A



RCDD-002 Sample Question 8


What is the MINIMUM cover for underground conduit? 

A. 152 mm (6 in) 
B. 305 mm (12 in)
C. 457 mm (18 in) 
D. 610 mm (24 in) 
E. 762 mm (30 in) 


ANSWER : D



RCDD-002 Sample Question 9


The MOST common medium used to provide service to the access point (AP) is ________ cable. 

A. Singlemode optical fiber 
B. Multimode optical fiber 
C. Unbalanced twisted pair 
D. Balanced twisted pair 


ANSWER : D



RCDD-002 Sample Question 10


Vertical conduit masts (with approved service heads) are limited to drop-wire attachments of up to ________ lines. 

A. 4 
B. 6 
C. 12 
D. 25 


ANSWER : A



RCDD-002 Sample Question 11


Which one of the following is NOT an advantage of underground conduit? 

A. Has a low initial installation cost 
B. Preserves the aesthetic appearance of the premises
 C. Adaptable for future placement or removal of facilities 
D. Provides the security of additional physical cable protection 
E. Is economical over a long life


ANSWER : A



RCDD-002 Sample Question 12


What is the horizontal separation, in well tamped earth, required between power and direct buried telecommunications facilities sharing the same trench? 

A. 152 mm (6 in) 
B. 229 mm (9 in) 
C. 300 mm (12 in) 
D. 381 mm (15 in) 
E. 457 mm (18 in) 


ANSWER : C



RCDD-002 Sample Question 13


When a building is not on the property line, the building owner should provide a MINIMUM of ________ conduits from a point inside the building, to the property line or easement for entrance facilities.

 A. Five 
B. Four 
C. Three
 D. Two 


ANSWER : D



RCDD-002 Sample Question 14


What type of redundancy provides two additional units, modules, paths, or systems in addition to the MINIMUM required to satisfy the base requirement. 

A. N 
B. N+1 
C. N+2 
D. 2N 
E. 2(N+1) 


ANSWER : C



RCDD-002 Sample Question 15


What does ANSI/TIA 942 recommend as the MINIMUM height for overhead cable tray above finished floor within a data center? 

A. 2.14 m (7 ft)
 B. 2.44 m (8 ft) 
C. 2.75 m (9 ft) 
D. 3.05 m (10 ft) 
E. 3.36 m (11 ft) 


ANSWER : C



RCDD-002 Sample Question 16


You have been asked to spec the physical security requirements related to the protection of assets for a new data center. The most common potential for damage categories you have considered include temperature, gases, organisms and projectiles. The one category that you have missed is: 

A. Aircraft flight paths 
B. Proximity to high speed rail links 
C. Liquids 
D. Parking lot exits 
E. Exposure to extreme winds 


ANSWER : C



RCDD-002 Sample Question 17


If you are working on a physical security plan for a data center and focusing on building and access control, what layer of the plan would this relate to? 

A. Layer 1 
B. Layer 2 
C. Layer 3 
D. Layer 4 
E. Layer 5 


ANSWER : C



RCDD-002 Sample Question 18


Within a data center, if you have a system which includes one extra unit, in addition to the minimum required to satisfy the base need, and where the failure of this unit will NOT disrupt operations, what level of redundancy would this represent? 

A. N 
B. N+1 
C. N+2 
D. 2N 
E. 2(N+1) 


ANSWER : B



RCDD-002 Sample Question 19


If you have a data center where the entire infrastructure must be completely shutdown on an annual basis to perform preventative maintenance and repair work, what tier level would this represent? 

A. Tier I 
B. Tier II 
C. Tier III 
D. Tier IV 


ANSWER : A



RCDD-002 Sample Question 20


What type of redundancy provides two complete units, modules, paths or systems for every one required for a base system. 

A. N 
B. N+1 
C. N+2 
D. 2N 
E. 2(N+1) 


ANSWER : D



RCDD-002 Sample Question 21


You are designing a cabling containment system installed overhead in a new data center. The main or prime purpose of the system will be to manage fiber optic cabling between cabinets. You have a choice of designs of the containment system. In view of the prime purpose of containment system, your first choice of design will be one that: 

A. Has a bottom design with a web spacing of less than 203 mm (8 in) 
B. Has a bottom design with a web spacing of less than 152 mm (6 in) 
C. Is manufactured with a soft cloth type material 
D. Has a solid bottom design E. The design is not important as long as the client pre approves the manufacturer 


ANSWER : D



RCDD-002 Sample Question 22


Within a data center, how many concentric layers are considered necessary to provide effective security? 

A. One 
B. Two 
C. Three 
D. Four 
E. Five


ANSWER : D



RCDD-002 Sample Question 23


Within a data center, if you have dual path connectivity between the primary entrance room and secondary entrance room, in addition to dual connectivity between these two rooms and the main distribution and secondary distribution areas, what tier level would this infrastructure design represent?

 A. Tier I
 B. Tier II 
C. Tier III 
D. Tier IV 
E. Tier V 


ANSWER : D



RCDD-002 Sample Question 24


If you have a 30 cm (12 in) wide data tray, what does ANSI/TIA 569-B recommend be the maximum pathway fill cross sectional area assuming a MAXIMUM pathway depth of 15 cm (6 in)? 

A. 112.5 sq cm (18 sq in) 
B. 150 sq cm (24 sq in) 
C. 225 sq cm (36 sq in) 
D. 300 sq cm (48 sq in) 
E. 450 sq cm (72 sq in)


ANSWER : C



RCDD-002 Sample Question 25


What is the MAXIMUM horizontal cable length permitted for centralized optical fiber cabling from the MDA within a data center?

 A. 100 m (328 ft)
B. 200 m (656 ft) 
C. 300 m (984 ft) 
D. 400 m (1312 ft) 
E. 500 m (1640 ft) 


ANSWER : C



RCDD-002 Sample Question 26


It is important to keep all underfloor cabling systems very neat and orderly. Cabling systems must be managed to ensure that air flow is not impeded by the height or volume of underfloor cabling. Keeping copper communications cabling properly separated from is one design approach. To resolve this: 

A. Power cabling should be routed in the space below the floor in either hot or cold aisle 
B. Route the copper cables in the cold aisle and route the power cabling in the hot aisle 
C. Power cabling should be routed in the overhead space 
D. Route the copper cables in the hot aisle and route the power cabling in the cold aisle 
E. Copper cabling can be routed in either hot or cold aisles without any consequence in performance of the network 


ANSWER : D



RCDD-002 Sample Question 27


You are renovating telecommunication rooms that support an acute care facility that has 10,000 sq ft floors. The facility will be adding 15,000 sq ft to each of the floors. What is the MINIMUM additional floor space that you will need to expand the TRs to support the new floor space? 

A. 3 m x 3 m (10 ft x 10 ft) 
B. 3.5 m x 4.3 m (11.5 ft x 14 ft) 
C. 3.0 m x 4.5 m (10 ft x 15 ft) 
D. 6 m x 6 m (20 ft x 20 ft) 


ANSWER : B



RCDD-002 Sample Question 28


Which of the following is used to create an electronic signal that can be sent to the central nurse call equipment? 

A. Headend module 
B. Initiation device 
C. Notification device 
D. Two tone device 


ANSWER : B



RCDD-002 Sample Question 29


You are designing a nurse call system for a health care facility. The system will have emergency call switches. What is the first step you should take in designing the nurse call system? 

A. Properly size the supporting TR to accommodate the headend system 
B. Program the headend device for the various call switches that will be used 
C. Perform a risk assessment to determine call switch locations 
D. Perform a site survey to verify the pathways that will connect the headend device with the call switches 


ANSWER : C



RCDD-002 Sample Question 30


You are designing an interactive patient television system (IPTS) that will provide internet, nurse call and LCD television services. From the following, which medium will NOT support these services in a backbone cabling system? 

A. Balanced twisted pair 
B. Coaxial 1/2 inch hard-line cable 
C. Multimode optical fiber cable 
D. RG-11 coaxial cable 


ANSWER : A



RCDD-002 Sample Question 31


You are designing a nurse call system for an assisted care facility. What type of nurse call system would best suit the needs for the facility? 

A. Audiovisual system 
B. Staff emergency system 
C. Tone/Visual system 
D. Bedside system 


ANSWER : C



RCDD-002 Sample Question 32


The ________ system is an application used for storing and viewing captured digital radiology image files. 

A. CCU 
B. ICU 
C. DICOM 
D. PACS 


ANSWER : D



RCDD-002 Sample Question 33


Which of the following is an alarm management output system? 

A. Patient monitoring system 
B. Bed monitoring system 
C. Security system 
D. Wireless telephone system 


ANSWER : D



RCDD-002 Sample Question 34


One interior TTY must be provided at locations defined as public accommodations with ________ or more pay telephones. 

A. One 
B. Two 
C. Four 
D. Six 
E. Eight 


ANSWER : C



RCDD-002 Sample Question 35


What is the air change requirement for a tunnel of 610 m (2000 ft) long with a diameter of 3.4 m (11 ft)? 

A. One complete air change per hour 
B. Two complete air changes per hour 
C. Three complete air changes per hour 
D. Four complete air changes per hour 
E. Five complete air changes per hour 


ANSWER : C



RCDD-002 Sample Question 36


In an office area, a consultant needs to add the location of a fax machine to the plan. What is the approximated floor area that a fax machine occupies? 

A. 0.2 sq m (2 sq ft) 
B. 0.5 sq m (5 sq ft)
 C. 1 sq m (10 sq ft) 
D. 1.5 sq m (16 sq ft) 
E. 2 sq m (20 sq ft) 


ANSWER : C



RCDD-002 Sample Question 37



for front reach using a wheelchair. What will be the maximum reachable height or the value of "X"?

 A. 760 mm (30 in) 
B. 864 mm (34 in) 
C. 1170 mm (46 in) 
D. 1220 mm (48 in) 
E. 1370 mm (54 in) 


ANSWER : D



RCDD-002 Sample Question 38


A. Place distribution cable onto the dock and terminate in a suitable cabinet or enclosure. Run service drop to each boat slip.
B. Provide one or two pair cables from the boat slips to a distribution terminal on the closest point of land. 
C. Pre-cable each boat slip during construction. 
D. For security, each run should be terminated in the patch panel/ cross-connect at the dockmaster or marina office. 


ANSWER : A



RCDD-002 Sample Question 39


What is the MINIMUM clearance needed between the front of the telephone booth and any wall or fixture for most installations? 

A. 300 mm (12 in) 
B. 450 mm (18 in) 
C. 610 mm (24 in) 
D. 914 mm (36 in) 
E. 2.4 m (8 ft) 


ANSWER : C



RCDD-002 Sample Question 40


A telephone facility and an electrical facility are required in a tunnel. To reduce the effects of EMI and eliminate the need for additional shielding of the cables, where would each facility be placed? 

A. On opposite sides of the tunnel 
B. On the same sides of the tunnel 
C. Together on the same pathway for easy access and maintenance 
D. One on the top part and one on the bottom part of the same side of the tunnel 
E. On the exterior of the tunnel 


ANSWER : A



RCDD-002 Sample Question 41


In new construction, what is the percentage of pay phones that must be equipped with volume controls?

A. 4 
B. 10 
C. 25 
D. 35
 E. 50 


ANSWER : C



RCDD-002 Sample Question 42


A. Teletypewriter/text telephone 
B. Public internet station 
C. Public telephone 
D. Public telephone with a shelfette 
E. Public telephone with access to high-speed internet connection 


ANSWER : A



RCDD-002 Sample Question 43


A. 760 mm (30 in) 
B. 864 mm (34 in) 
C. 1170 mm (46 in) 
D. 1220 mm (48 in) 
E. 1370 mm (54 in) 


ANSWER : E



RCDD-002 Sample Question 44


Which type of protection for electrical power stations provide isolation against a rise in potential of station ground and also provide drainage protection against longitudinallyinduced voltages? 

A. Isolating transformers 
B. Neutralizing transformers 
C. Mutual drainage reactors 
D. Unit-type neutralizing transformers 
E. 2-winding neutralizing transformers 


ANSWER : A



RCDD-002 Sample Question 45


Coupling with electrical circuits can create inductive interference to telecommunications facilities. Which of the following can decrease the coupling effect? 

A. Decrease the exposure length 
B. Make sure that the single-phase components add in phase 
C. Decrease the physical separation 
D. Increase the earth resistance 


ANSWER : A



RCDD-002 Sample Question 46


What is the MINIMUM distance from the edge of a pool or other water hazards for a weatherproof enclosure? 

A. 1 m (3 ft) 
B. 2 m (7 ft) 
C. 4 m (13 ft) 
D. 6 m (20 ft) 
E. 10 m (30 ft) 


ANSWER : D



RCDD-002 Sample Question 47


A. Installed one or two pair cables from the boat slips to a distribution terminal on the closest point of land. 
B. Place distribution cable onto the dock and terminate in a suitable cabinet or enclosure. Install service drop to each boat slip. 
C. Pre-cable each boat slip during construction. 
D. For security, each install should be terminated in the patch panel/cross-connect at the dockmaster or marina office. 


ANSWER : A



RCDD-002 Sample Question 48


You have just finished a design calling for 15 telecommunications outlets. You received word that the owner has increased his requirements by 40%. What size commercial DD (distribution device) is required to accommodate the increase? 

A. 660 mm (26 in) 
B. 1015 mm (40 in) 
C. 1346 mm (53 in) 
D. 1676 mm (66 in) 


ANSWER : C



RCDD-002 Sample Question 49


To accommodate telephone, data, CATV, security and multimedia, a MINIMUM of ________ strands of optical fiber auxiliary disconnect outlet (ADO) cable should be provided. 

A. Two 
B. Four 
C. Five 
D. Six
 E. Eight 


ANSWER : B



RCDD-002 Sample Question 50


You are designing a multi-story dwelling and need to place the CTR's. Every floor is not available. What is the alternate spacing for the CTRs? 

A. Every 2 floors 
B. Every 3 floors 
C. Every 4 floors 
D. Every 5 floors 
E. 1st floor and midway up through the height of the building


ANSWER : B



RCDD-002 Sample Question 51


You are designing distribution for a seven unit townhouse with in slab conduits. What is the MINIMUM number of 27 mm (1 in) rigid PVC Type 2 or metallic conduit that is required to satisfy distribution to each unit? 

A. Three 
B. Four 
C. Five 
D. Seven 
E. Fourteen 


ANSWER : D



RCDD-002 Sample Question 52


Which service is NOT typical of Grade 1? 

A. Telephone 
B. Multimedia 
C. Data 
D. Television 


ANSWER : B



RCDD-002 Sample Question 53


You are designing a system requiring the transmission of data. Your system must perform higher than ________ kHz in order to do so. 

A. 4 
B. 8 
C. 10 
D. 16 
E. 32 


ANSWER : C



LOGIN YOUR ACCOUNT




2 Exams Files

10% off

  • Latest and Most Up-todate Dumps
  • Free 3 Months Updates
  • Exam Passing Guarantee
  • Secure Payment
  • Privacy Protection

3 Exams Files

15% off

  • Latest and Most Up-todate Dumps
  • Free 3 Months Updates
  • Exam Passing Guarantee
  • Secure Payment
  • Privacy Protection

5 Exams Files

20% off

  • Latest and Most Up-todate Dumps
  • Free 3 Months Updates
  • Exam Passing Guarantee
  • Secure Payment
  • Privacy Protection

10 Exams Files

25% off

  • Latest and Most Up-todate Dumps
  • Free 3 Months Updates
  • Exam Passing Guarantee
  • Secure Payment
  • Privacy Protection